HOW TO INSTALL
Installing
Cleanroom
Air Conditioner
Turbulence Flow
Step 1
Drill 2 holes on th wall.
-
1st hole for drainage, refrigerant, and electric wire.
-
2nd hole for air duct from Positive Pressure Air Purifier.
Step 2
Install Air Conditioner's Fan Coil Unit
inside the room.
Step 3
Install a Condensing Unit and
a Positive Pressure Air Purifier on the outside.
Step 4
Connect the air duct and control wires with the fan coil unit inside the room.
Step 5
Install ULPA Filter
with the Fan Coil Unit and test the air quality
Laminar Flow
STEP 1
Install a service room
STEP 2
-
Install an air return vent between the cleanroom and service room
-
Install Laminar Flow Air Conditioning Unit inside the service room
STEP 3
-
Install a condensing unit on the outside
STEP 4
-
Install a positive pressure air purifier for the service room
-
Install air duct from the air conditioner and 2 Fan Filter Units (FFU) inside the cleanroom
STEP 5
Turn on the system and test the air quality